- Home
- Quality
Quality you can audit
Every batch is inspected at defined points and carries its records, from the rod's mill certificate to the final inspection report. Visit the plant or ask for a sample set of documents.
- Certificate
- Copy on request
One route card follows every batch
Eight operations, each with its check and record. The rod's heat number links every record to the carton label.
| Op. | Operation · check | Recorded |
|---|---|---|
| OP 10 | Contract reviewDrawing revision, quantities and special characteristics agreed with the customer. Control plan issued. | Rev. B accepted |
| OP 20 | Incoming rodMill test certificate checked against the order; composition tested at an outside lab. | Heat 4417 Cu 58.1 · Pb 2.9 % |
| OP 30 | Hot forgingNot required for this part: turned directly from hex bar. | — |
| OP 40 | TurningCam automat. First-off part fully measured and approved before the run starts. | Ø22 ±0.05 → 21.98 |
| OP 50 | In-process inspectionThread, Ø and length gauged at set intervals on the machine. | M20×1.5-6g GO ✓ NO-GO ✓ · n = 5 |
| OP 60 | PlatingNickel plated in our plant; coating thickness measured per lot. | Ni 6.2 µm |
| OP 70 | Final inspectionSample inspection of each batch (dimensions and appearance); final inspection report issued. | Lot released |
| OP 80 | Pack & labelPacked to your specification; label carries your part number and revision, lot, heat number and quantity. | Lot AG-26-0412 2,000 pcs |
Inspection instruments
Threads and dimensions are checked with our own gauges and micrometers. Chemical composition and tensile tests are done at an outside lab.
| Instrument | Checks |
|---|---|
| Thread gauges | Parallel threads (M, PG, BSP, UNC/UNF) GO / NO-GO |
| Plain plug and ring gauges | Bores and diameters; special gauges for critical dimensions |
| Micrometers | Outside, inside and thread-pitch measurement |
What you receive
Standard documents come with every batch; others come with samples or on request.
| Document | When |
|---|---|
| Initial sample inspection report | With samples |
| PPAP submission, Level 3 | With samples, on request |
| Mill test certificate (rod), EN 10204 3.1 | Each batch |
| Final inspection report | Each batch |
| Plating thickness report | Plated batches |
| Certificate of conformity | Each batch |
| REACH / SCIP statement | On request |
How the system works
Details buyers ask for in supplier questionnaires.
- Traceability
- Lot number linked to the rod heat number on every record and label
- Calibration
- Gauges and instruments calibrated yearly by an NABL-accredited lab
- Complaints
- Root-cause analysis and corrective action; 8D report within 5 days
- Final inspection
- Sample inspection of every batch before packing; in-process and inter-process checks recorded on the route card
- Outside processes
- Chemical composition and tensile tests at an outside lab
- Quality contact
- Shree Shah, Marketing Director · arrange an audit or request documents
Running a supplier approval?
We can send the certificate, a sample document set and a completed supplier questionnaire, or host an audit in Jamnagar.